Location: Kew Bridge · Duration: 14 days · Budget: £9,200
Stripped-out original 1990s suite. Replaced with contemporary fittings, full retile, underfloor heating, recessed lighting.

Location: Brentford Dock · Duration: 11 days · Budget: £8,400 (DFG-funded)
Bath replaced with level-access shower, grab rails, widened doorway, non-slip flooring. Delivered for a client recovering from a stroke.

Location: Syon Park · Duration: 18 days · Budget: £11,750
Fully tanked wet room installed into a new loft conversion. Challenge: routing waste through existing stack.

Location: Brentford Lock · Duration: 12 days · Budget: £7,100
Converted an unused wardrobe space into a fully plumbed ensuite. First-fix plumbing routed through a void under the floor.