High St, London TW8 0AA
E-mail us: [email protected]
Free Design Consultation
Follow us:
Pricing — Brentford Bathroom Fitters
Pricing

Bathroom Fitting Prices in Brentford

Pricing
transparent costs
Honest, Fixed-Price Quotes

Every Brentford Bathroom Fitters bathroom comes with a fixed-price quote. No hourly rates, no surprise invoices — you see the full cost before any work begins.

Bathroom prices vary based on size, layout changes, and the fixtures you choose. To give you a starting point, here are typical ranges for projects in Brentford in 2026:

  • Small cloakroom refurbishment — from £3,500 (labour + materials)
  • Standard family bathroom — from £7,500
  • Full bathroom refurbishment with layout change — from £10,500
  • Wet room installation — from £9,000
  • Ensuite installation — from £6,500
  • Disabled adaptation bathroom — from £8,000 (grants may apply)

These figures are installation-inclusive guides only. Final quotes are issued after a free in-home consultation, based on your chosen layout, fixtures, and finishes. Call 020 3355 7079 for your free quote.

Bathroom Fitting Prices — Brentford Bathroom Fitters

What you'll typically pay in Brentford

Bathroom fitting prices vary widely based on size, layout changes, fitting choices, and whether structural work is needed. The figures below are typical ranges for Brentford and the surrounding TW8 0AA area, including labour, materials, waste disposal, and certificates. London adds 10-20% over national averages.

Small refresh — £2,500 to £5,500

Replacing the suite (bath, basin, WC) and shower in their existing positions, with a partial retile and refurbished pipework. No layout changes, no structural work. Typical timeline: 5-7 working days. Best for an outdated bathroom that's structurally sound but tired.

Standard family bathroom — £5,500 to £9,500

Full refurbishment with new suite, full retile, new flooring, possible minor layout adjustments, new ventilation, and updated electrics. The most common project we do. Typical timeline: 10-12 working days. Standard mid-range fittings; choice of porcelain or ceramic tiles.

Premium refurbishment — £10,000 to £18,000

Layout changes (moving the toilet, changing window positions), high-spec fittings, large-format porcelain tiles, underfloor heating, frameless glass enclosure, and bespoke vanity. Typical timeline: 14-18 working days. We can specify designer brands like Hansgrohe, Burlington, or Villeroy & Boch.

Wet room — £8,000 to £15,000

Full tanking, sloped screed floor, linear drain, slip-resistant porcelain, walk-in shower with optional glass screen, updated ventilation. Premium for upstairs installations needing structural floor work. Typical timeline: 12-15 working days.

Disabled adaptations

Most accessible bathroom adaptations are eligible for the Disabled Facilities Grant (up to £30,000 in England) and 0% VAT relief for qualifying homeowners. The grant covers level-access showers, walk-in baths, grab rails, and accessible WCs. We complete the eligibility paperwork with you and bill the council directly. See full disabled adaptations service.

What's included in every quote

  • Strip-out, skip hire, and licensed waste disposal
  • All labour: plumbing, electrics, tiling, plastering, flooring
  • Building Regulations notifications (Part F, Part G, Part H, Part P)
  • Electrical Installation Certificate (EIC)
  • Workmanship guarantee in writing
  • TrustMark Insurance-Backed Guarantee (cease-to-trade cover)
  • Daily clean-down and access protection

What affects the final price

Beyond the headline scope, three things move the price:

  1. Layout changes: moving the toilet adds £800-2,500 (rerouting the soil pipe). Moving basin or bath is cheaper at £200-500.
  2. Hidden problems: rot in joists, asbestos in old artex ceilings, or lead pipework typically adds £500-1,500. We always agree the fix with you in writing before doing the extra work.
  3. Fitting tier: standard suite (£800-1,500) vs mid-range (£1,500-3,000) vs premium (£3,000-7,000+). Same labour, very different materials cost.

Payment terms

We typically take a deposit on order to secure materials, a stage payment when first fix is complete, and the balance on handover after you've signed off the snag list. We don't ask for full payment up-front. If you'd prefer different stage timings, ask — we work with you. We accept BACS, debit/credit card, and cheque.

How we compare on price

We're typically not the cheapest quote you'll get and we're rarely the most expensive. We aim to sit in the upper-middle of the local market — pricing that reflects proper substrate preparation, registered electricians, in-house trades, and full insurance cover. If a competing quote is materially lower than ours, ask what's been left out: skimping on tanking, using subcontract labour, omitting Building Regs notifications, or excluding waste disposal are common ways quotes get artificially low.